Consultancy Services for Detailed Design and Construction Supervision of the Achna Sewage Treatment Plant (10,600 m³/day), Lagoons, Sewerage and Irrigation Networks (40+ km Combined)

Client: Cyfield Engineering and Contracting Public Ltd
Estimated construction cost: Approximately €25 million

Project overview

P. Nicolaides and Associates provided consultancy services for the Achna Sewage Treatment Plant and its associated works. The commission included detailed design, drawings and specifications, as well as construction supervision through to completion.

The project is important for its role in improving wastewater management and supporting the responsible use of water resources. By combining wastewater treatment with effluent storage, sewerage infrastructure and irrigation facilities, it provides an integrated approach to managing wastewater and treated water. These works support environmental protection and the reliable operation of essential water services in the area.

Main treatment plant

The sewage treatment plant has a capacity of 10,600 m³ per day. Its facilities include emergency storage, septage reception and treatment, and sludge treatment and storage.

Storage lagoons

The project includes two main treated-effluent storage lagoons with a combined capacity of approximately 645,000 m³, together with one additional emergency storage lagoon.

Pumping stations

The works include more than 80 underground reinforced-concrete pumping-station wet wells, as well as pumping stations serving the wider system.

Sewerage and irrigation networks

The project includes an irrigation system with pumping stations and irrigation piping, together with gravity and pressure sewerage networks and pumping stations. The combined network length is over 40 km.

Associated works

The consultancy scope also covered other works and facilities required by the contract for the proper operation and functioning of the project.

Construction cost and completion

The construction cost was approximately €25 million. Construction was completed in January 2024.