Detailed Design, Tender Preparation and Construction Supervision for the Restoration of 24 Landfills in Nicosia District, Including Stormwater, Leachate and Gas Management, Membrane Covers and Internal Road Networks
Client: Water Development Department, Cyprus
Estimated construction cost: Over €25 million
Completion date: 2025
Project overview
Our company provided detailed design, tendering support and construction supervision for the restoration and aftercare of 24 uncontrolled dump sites in Nicosia District, including Kotsiatis, one of Cyprus’s largest former disposal sites. The works involved the excavation and transfer of more than 1,800,000 m³ of waste. The total volume of waste across the landfills is unknown, but is estimated at more than 3,000,000 m³. The restoration addressed environmental and public-health risks through engineered final cover, landfill-gas collection and controlled treatment, leachate collection and storage, stormwater drainage and long-term environmental monitoring. These measures aimed to protect surface water and groundwater and return the sites to an environmentally acceptable condition.
Detailed design, tender preparation and evaluation
Our work began with site investigations and the detailed design of the restoration measures. These included reshaping waste deposits, engineered membrane-cover systems, internal road networks, leachate collection, landfill-gas extraction, stormwater drainage, landscaping, site infrastructure and long-term environmental monitoring. We prepared the studies, drawings, technical specifications, cost estimates and work programmes needed for construction. The Kotsiatis design included a provision for the generation of electricity from collected landfill gas. We also prepared the construction tender documents and assisted with tendering and tender evaluation.
Construction supervision
Our engineering team provided full-time, on-site construction supervision. We checked the works against the approved designs and specifications, monitored quality and progress, and resolved technical issues during construction. At the rehabilitated Kotsiatis landfill, the restoration included more than 500,000 m² of soil backfilling, a landfill-gas collection system with 105 extraction wells, a gas flare for controlled treatment of the collected gas, a leachate collection and storage system, stormwater drainage works, and environmental monitoring infrastructure.