Development of a Safety and Health Plan during the study phase and the execution phase

The health and safety plan is used as a risk mitigation tool and should be adjusted based on any changes that may occur before or during the commissioning of a project.

The health and safety plan must be prepared during the early design stages of the project by the appointed health and safety coordinator. The project must be monitored by the coordinator at every phase of the project and must be updated accordingly based on the progress of the project. The health and safety plan is required to be available for all members associated with the project.